AT&T No. 1/1B Traffic Service Position System (1/1B TSPS)

(last updated: 16-May-2015 09:31)
 

Books

  1. Pages 414, 438-443 of Engineering and Operations in the Bell System, Second Edition; R.F. Rey, Technical Editor; AT&T Bell Laboratories, 1983.

Periodical Articles

  1. "New Member of Electronic Switching Family Speeds Long-Distance Calls", BLR 47:2 Feb 1969 pgs 64-65.
     
  2. Issue of The Bell System Technical Journal partly on "TSPS No. 1", BSTJ 49:10 Dec 1970.
     
  3. "TSPS No. 1: System Organization and Objectives", BSTJ 49:10 Dec 1970 pgs 2417-2443.
     
  4. "TSPS No. 1": Stored Program Control No. 1A", BSTJ 49:10 Dec 1970 pgs 2445-2507.
     
  5. "TSPS No. 1: Stored Program Control No. 1A Store", BSTJ 49:10 Dec 1970 pgs 2509-2560.
     
  6. "TSPS No. 1: Peripheral Circuits", BSTJ 49:10 Dec 1970 pgs 2561-2623.
     
  7. "TSPS No. 1: Operational Programs", BSTJ 49:10 Dec 1970 pgs 2625-2683.
     
  8. "TSPS No. 1: Physical Design", BSTJ 49:10 Dec 1970 pgs 2685-2709.
     
  9. "TSPS No. 1: System Testing", BSTJ 49:10 Dec 1970 pgs 2711-2728.
     
  10. "Solving Software Problems in TSPS No. 1", BLR 49:10 Nov 1971 pgs 316-321.
     
  11. "Expanding TSPS: Business as Usual During Alterations", BLR 52:5 May 1974 pgs 147-151.
     
  12. "TSPS Goes to the Country", BLR 55:6 Jun 1977 pgs 146-153.
     
  13. Issue of The Bell System Technical Journal on Traffic Service Position System No. 1: Recent Developments", BSTJ 58:6:1 Jul-Aug 1979.
     
  14. "TSPS No. 1 Recent Developments: An Overview", BSTJ 58:6:1 Jul-Aug 1979 pgs 1109-1118.
     
  15. "TSPS No. 1 Recent Developments: Remote Trunk Arrangement: Overall Description and Operational Characteristics", BSTJ 58:6:1 Jul-Aug 1979 pgs 1119-1135.
     
  16. "TSPS No. 1 Recent Developments: Remote Trunk Arrangement and Position Subsystem No. 2: Transmission and Signaling Considerations", BSTJ 58:6:1 Jul-Aug 1979 pgs 1137-1165.
     
  17. "TSPS No. 1 Recent Developments: Remote Trunking Arrangement: Hardware and Software Implementation", BSTJ 58:6:1 Jul-Aug 1979 pgs 1167-1205.
     
  18. "TSPS No. 1 Recent Developments: Automated Coin Toll Service: Overall Description and Operational Characteristics", BSTJ 58:6:1 Jul-Aug 1979 pgs 1207-1223.
     
  19. "TSPS No. 1 Recent Developments: Station Signaling and Announcement Subsystem: Hardware for Automated Coin Toll Service", BSTJ 58:6:1 Jul-Aug 1979 pgs 1225-1249.
     
  20. "TSPS No. 1 Recent Developments: Automated Coin Toll Service: Software", BSTJ 58:6:1 Jul-Aug 1979 pgs 1251-1290.
     
  21. "TSPS No. 1 Recent Developments: Automated Coin Toll Service: Human Factors Studies", BSTJ 58:6:1 Jul-Aug 1979 pgs 1291-1305.
     
  22. "TSPS No. 1 Recent Developments: Software Development Tools", BSTJ 58:6:1 Jul-Aug 1979 pgs 1307-1333.
     
  23. "TSPS No. 1 Recent Developments: System Verification and Evaluation Procedures", BSTJ 58:6:1 Jul-Aug 1979 pgs 1335-1346.
     
  24. "TSPS No. 1 Recent Developments: Operator Training Facilities", BSTJ 58:6:1 Jul-Aug 1979 pgs 1347-1357.
     
  25. "Checking a Busy Line - TSPS Does It Better", BLR 58:4 Apr 1980 pgs 128-131.
     
  26. "Traffic Service Position System No. 1: Busy Line Verification Feature", BSTJ 59:8 Oct 1980 pgs 1397-1416.
     
  27. "Programmable Simulator Speeds Operator Training", BLR 59:7 Sep 1981 pgs 213-216.
     
  28. "Toward a More Automated Network - TSPS Enhancements Lead the Way", Telephony 202:6 Feb 8 1982 pgs 45-48.
     
  29. "A Miniaturized Bridging Repeater that Offers Giant-Size Savings", Telephony 202:6 Feb 8 1982 pgs 52-53.
     
  30. "SPC Network: Calling Card Service - TSPS Hardware, Software, and Signaling Implementation", BSTJ 61:7:3 Sep 1982 pgs 1675-1714.
     
  31. "Opening Up Job Possibilities for Visually Impaired People", BLR 61:1 Jan 1983 pgs 25-31.
     
  32. "Expanding the Capabilites of the Traffic Service Position System", BLR 61:2 Feb 83 pgs 22-27.
     
  33. Issue of The Bell System Technical Journal on Traffic Service Position System No. 1B, BSTJ 62:3:3 Mar 1983.
     
  34. "TSPS No. 1B: Overview and Objectives", BSTJ 62:3:3 Mar 1983 pgs 755- 764.
     
  35. "TSPS No. 1B: System Description", BSTJ 62:3:3 Mar 1983 pgs 765-774.
     
  36. "TSPS No. 1B: Real-Time Architecture Utilizing the DMERT Operating System", BSTJ 62:3:3 Mar 1983 pgs 775-826.
     
  37. "TSPS No. 1B: Hardware Configuration", BSTJ 62:3:3 Mar 1983 pgs 827- 858.
     
  38. "TSPS No. 1B: Software Development System", BSTJ 62:3:3 Mar 1983 pgs 859-884.
     
  39. "TPS No. 1B: Integration and System Testing", BSTJ 62:3:3 Mar 1983 pgs 885-905.
     
  40. "TSPS No. 1B: Retrofitting the Processor", BSTJ 62:3:3 Mar 1983 pgs 907-917.
     
  41. "TSPS No. 1B: Capacity and Reliability Evaluation", BSTJ 62:3:3 Mar 1983 pgs 919-939.
     
  42. "TSPS No. 1B: Switching Control Center System Interface", BSTJ 62:3:3 Mar 1983 pgs 941-957.
     
  43. "TSPS No. 1B: Long-Range Planning Tools", BSTJ 62:3:3 Mar 1983 pgs 959-978.
     
  44. "Helping Switches to Account for Themselves", BLR 63:2 Mar 1985 pgs 16-22.